Thursday, 19 December 2019

Disappointing day

The day started well, as the expected torrential rain did not make an appearance, and my flooring delivery arrived nice and early.
Daz and I managed to drag it onto the high scaffolding and batten it down.
Next on the list was to correct a mistake that I made yesterday. We had carried all of the spare white bricks up on to the high scaffolding and then this morning I realised that Trevor now didn't have enough to finish the wall lower down.
Cue my plan of filling a blue IKEA bag with bricks and using the hoist to get it up on to the scaffold. This went better than expected until the handset started smoking, and an investigation revealed that water had got into it.
By the time Trevor arrived very late after his own problems, we had reverted to making a Blue Peter style makeshift rope and dragging the bricks up by hand.
It then got worse as we also had to drag the incredibly heavy mortar buckets up the same way.
I would have taken a photo but I was getting a bit tired and mardy by then.
Also at the back of my mind was the scaffolder issue. However, when I did phone him to say that we wouldn't be ready, he was fine and just said to let him know when we would be ready.  Have I misjudged him?
The rain then started hammering down and we are already paddling around, so it's a worry. Here is the sad state of our kitchen and living room.



Daz has ordered a new hoist that arrives Saturday and we then went shopping to cheer up.


Wednesday, 18 December 2019

Scaffolding surprise

We had another run in with the scaffolder on Monday, and when I asked if we could pencil in the another scaffold lift he had a tantrum and said that there was no chance until the 6th of January as he was incredibly busy.
It was very annoying, but we had no choice, and since then we have lost a lot of time anyway because of bad weather.
Imagine our surprise when he turns up today and tries to spin it that he is doing us a favour by lifting the scaffolding now.
The only trouble is that we aren't ready, but that didn't put him off, so he has done half of it.



Trevor is sure that he is going to turn up tomorrow to do the other half, but we still won't be ready.
I am sure that he has some major anger management issues, so I am expecting some fireworks.

Sunday, 15 December 2019

Santa fun run

Excellent event this morning as we got on our bikes and cycled down to the centre of Bicester for the annual Santa fun run.


Once there we put on our very itchy beard/moustache combos and joined hundreds of other sporty Santas.



Very soon we were off on our loop of the town and were cheered along by lots of Christmas shoppers.


All too soon it was over and we admired our festive medals and tucked into bacon butties.
We also got a photo of the very young looking Mayor of Bicester, Mr Jason Slaymaker. (Great name.)




Friday, 13 December 2019

Latest front and back shots

Right at the beginning of the build I started off by showing front and back photos of the plot.
We are now eight weeks into the build and this is how far we have got. We have slowed down because we lost a few days to the weather, but still moving on.



We have also solved our ongoing problem with the extra steel beam. I managed to get it designed by the structural engineer, then got it made by the fabrication company in Nottingham, but I was completely stumped as to how to get it to our site.
The trouble was that it is 4.5 metres long and the longest van that it is possible to hire is only 4.2 metres.
We tried courier companies but they also only used 4.2 metre vans so couldn't bring it.
Removal companies had big enough vans but they came with a huge price tag.
In the end I found a company that hired flat bed vans with idea that we could rest it up against the back of the cab, sowe hhired it and drove up to fetch it. In the end it actually easily fitted across the base of the van so was much easier than we expected.


It's probably the smallest load ever moved, but at least it's done.


Wednesday, 11 December 2019

Progress on the balcony

Until now the future balcony has just been a gaping hole in the ceiling. However, yesterday and today Darren started to fix that.



There isn't anything to walk on yet, but there are joists and noggins, and I will be making a few phone calls tomorrow so soon there should be a floor.
Darren has set up a great little workshop in the future kitchen and has even copied Trevor and got himself a heavy duty builders radio.


He's very pleased because now he doesn't have to listen to radio two all day.

Monday, 9 December 2019

My birthday and surprise delivery

We took a long weekend off because it was my birthday. I did absolutely nothing all day and it was glorious. Had some lovely presents and cards, and enjoyed a chocolate pizza from Darren's mum.


Back to work today and I can't remember if I have mentioned it before, but I have spent many, many hours trying to finalise the joist plans for the second and top floors. After probably at least 100 emails and phone calls it was at last sorted out and I paid them.
Towards the end of last week I found out that they hadn't started making the joists after all due to another misunderstanding. So I had missed my delivery date and they wouldn't give me a new one.
Disappointed, I sat back to wait, so I was really caught out unprepared when the whole lot arrived at 9.30 this morning.
Our lovely neighbour Robert came round to the help unload and it looked quite small on the huge lorry.
It rapidly expanded as we unloaded and by the time we got it inside the house it was enormous.


Just got to get it all up to the next floor and then on to the top of the blocks.