Friday 22 November 2019

Up and up

It was a showery day today and Trevor worked on the blocks because he prefers dry weather to lay bricks.
As the blocks are six times as big as bricks, then the progress looks much more spectacular.
By the end of the day the first floor, in parts at least, was at least five feet higher than yesterday.



We also have a temporary ladder to get up to the first floor, and will very soon have an internal wall to the left of it and although you can't see it, Darren has built a safety rail to the right.


No comments:

Post a Comment