I have started a painting production line on the first floor and am painting the cladding in umbra grey, ral number 7022. This is very specific, because the window frames are that colour and we want it to match.
The front of the house currently looks like this.....
and it will all need to be filled in.
Darren is working on the door surround at the moment, and we have the first tester pieces for the angle by the front door.
Zoom the photo in on the bottom left hand corner of the big hole.
No comments:
Post a Comment