Tuesday 25 February 2020

Progress on the top floor

The top floor is coming along nicely, and here are three time lapse photos.


This is just plain plywood covering.


This is our insulation, which was a bit difficult to put up in the wind.


This photo shows our breathable membrane that we fixed on top of the insulation with wooden batons.
What a nightmare that was with the wind trying to rip the membrane off the wall and me fighting to hold it on while Darren screwed the batons in to place.
It was really cold too, and for the final layer I was up on top of the roof holding everything down, while Darren was on the top of the ladder.
Three hours later I am still trying to get warm.

1 comment: