Saturday, 25 January 2020

New stud wall

Busy day today, and Darren has made a start on the stud wall on the top floor.
We only have one room at the top and one wall is brick, the back wall is almost all glass, and the remaining two are wooden stud walls filled with insulation.



The first four panels are up and are currently a bit unstable, but we have braced them as much as possible and it is not due to be too windy in the next few days.