Saturday, 18 January 2020

Full height at the front

We have reached the top at the front of the house, although we still need the bricks and coping stones to finish it off.


Look closely at the top and you can just see Darren on the future roof terrace.
I spent almost all day clearing up after Trevor, as there was mortar covering almost every surface inside the house.
At least now though he won't be dropping more mortar from above back on to the newly cleaned surfaces - well I hope not anyway.
Darren spent all day putting the plywood layer of the roof on. It is slow going but progress is being made. Although we had a slow start this morning because there was a frost and everything was white over and frozen together.



No comments:

Post a Comment